Arcedges Building India LLP · ERPNext Phase 1 · KTree
The same job opened along its own structure: Building → Phase → Lot → piece. Phases carry plan-vs-actual and buyouts; lots carry the nine operations (or the job-work reconciliation when a lot is with a vendor); every piece carries its full dated journey. Click any row to expand.
⚠ sample data — design mockup for review, not live figuresItem level: expand a phase for its lots and buyouts; expand a lot for its operations and pieces. Job-work lots show the vendor reconciliation instead. Click any row to open it.
Buyouts: insulation received ✓ · louvers received ✓ · doors PO placed, due 05-Sep · fasteners dispatched with lot 1 ✓
| CUT | FIT-UP | WELD | BLAST | PAINT | QR | DISP | MVR | ERECT |
|---|---|---|---|---|---|---|---|---|
| ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 | ✓ 74 |
| CUT | FIT-UP | WELD | BLAST | PAINT | QR | DISP | MVR | ERECT |
|---|---|---|---|---|---|---|---|---|
| ✓ 98 | ✓ 98 | ✓ 98 | ✓ 98 | ✓ 98 | ✓ 98 | 58 · 59% | 51 · 52% | — |
showing 3 of 98 pieces · full list sorts by status, weight or date
Buyouts: insulation PO placed, due 02-Sep · louvers not ordered — needed by 10-Sep · fasteners in stock ✓
| CUT | FIT-UP | WELD | BLAST | PAINT | QR | DISP | MVR | ERECT |
|---|---|---|---|---|---|---|---|---|
| ✓ 88 | 71 · 81% | 42 · 48% | 12 · 14% | — | — | — | — | — |
welding by Shree Fab (shop-floor subcontract, rate/ton) · certified against job card JC-465-21 · 38 MT this month
| ISSUED | AT VENDOR | RETURNED | QC AT RETURN | RECONCILIATION |
|---|---|---|---|---|
| 80 MT raw challan CH-118 · 02-Aug |
31 MT · 24 days due back 28-Aug |
46 MT fabricated 3 return challans |
44 accepted ✓ 2 rework |
issued 80 = returned 46 + WIP 31 + scrap 2.6 · loss 0.4 balanced ✓ |
work order ₹7.2 L · billed & certified ₹4.1 L · last-job rating B+ · current load with vendor: 74 MT across 2 jobs
Buyouts: polycarbonate sheet PO placed · turbo vents not due yet
galvanised items route through an outsourced operation — tracked out and back inside the piece strip