Arcedges Building India LLP · ERPNext Phase 1 · KTree

Job Drilldown — item level

The same job opened along its own structure: Building → Phase → Lot → piece. Phases carry plan-vs-actual and buyouts; lots carry the nine operations (or the job-work reconciliation when a lot is with a vendor); every piece carries its full dated journey. Click any row to expand.

⚠ sample data — design mockup for review, not live figures

Drilldown — J465 · Building B1

Item level: expand a phase for its lots and buyouts; expand a lot for its operations and pieces. Job-work lots show the vendor reconciliation instead. Click any row to open it.

PH-1 140 MT · 172 pcs prodn 100% ✓ · disp 136/172 ✓ on plan · disp due 30-Aug

Buyouts: insulation received ✓ · louvers received ✓ · doors PO placed, due 05-Sep · fasteners dispatched with lot 1 ✓

Lot 1 62 MT · 74 pcs complete — erected
CUTFIT-UPWELDBLASTPAINTQRDISPMVRERECT
✓ 74✓ 74✓ 74 ✓ 74✓ 74✓ 74 ✓ 74✓ 74✓ 74
Lot 2 78 MT · 98 pcs disp 58/98 · MVR 51/58 ⚠ 96 MT chain held by G1
CUTFIT-UPWELDBLASTPAINTQRDISPMVRERECT
✓ 98✓ 98✓ 98 ✓ 98✓ 98✓ 98 58 · 59%51 · 52%
RB-102 Rafter beam · 1,240 kg · heat E21094 at site · MVR ✓ 19-Aug
Cut04-08 Fit-up07-08 Weld09-08 Blast12-08 Paint14-08 QR14-08 Disp18-08 MVR19-08 Erect
CL-204 Column · 980 kg · heat E21094 dispatched 18-Aug · MVR pending 3 days
Cut05-08 Fit-up08-08 Weld10-08 Blast13-08 Paint15-08 QR15-08 Disp18-08 MVRpending Erect
PR-311 Purlin · 86 kg · coil C-8841 in weld since 21-Aug
Cut19-08 Fit-up20-08 Weldnow Blast Paint QR Disp MVR Erect

showing 3 of 98 pieces · full list sorts by status, weight or date

PH-2 150 MT · 186 pcs prodn 60% · disp — ⚠ dispatch due 28-Aug · running 6 days late

Buyouts: insulation PO placed, due 02-Sep · louvers not ordered — needed by 10-Sep · fasteners in stock ✓

Lot 1 · in-house 70 MT · 88 pcs prodn 42/88 in weld
CUTFIT-UPWELDBLASTPAINTQRDISPMVRERECT
✓ 8871 · 81%42 · 48% 12 · 14%

welding by Shree Fab (shop-floor subcontract, rate/ton) · certified against job card JC-465-21 · 38 MT this month

Lot 2 JOB WORK · Meher Engg 80 MT issued returned 46 MT · at vendor 31 MT ⚠ due 28-Aug · 6 days behind
ISSUEDAT VENDORRETURNEDQC AT RETURNRECONCILIATION
80 MT raw
challan CH-118 · 02-Aug
31 MT · 24 days
due back 28-Aug
46 MT fabricated
3 return challans
44 accepted ✓
2 rework
issued 80 = returned 46 + WIP 31 + scrap 2.6 · loss 0.4
balanced ✓

work order ₹7.2 L · billed & certified ₹4.1 L · last-job rating B+ · current load with vendor: 74 MT across 2 jobs

PH-3 130 MT · 158 pcs prodn 18% · disp — ✓ on plan · starts wk-38

Buyouts: polycarbonate sheet PO placed · turbo vents not due yet

ST-410 Staircase · 610 kg · heat E21102 at galvanising · due back 27-Aug
Cut19-08 Fit-up20-08 Weld21-08 Galv @ Zenithout 22-08 · due 27-08 Paint QR Disp MVR Erect

galvanised items route through an outsourced operation — tracked out and back inside the piece strip

PH-4 100 MT · 122 pcs not started ✓ on plan · starts wk-41

job cards not yet released — BOM issued, awaiting MDP slot (PPC synchronisation)