Every live job on one line — the segments are the stages of the job, the fill shows how far each has gone, and a red flag means a hold is open. Click through to the Job Status and Drilldown pages for the detail behind J465.

⚠ sample data — design mockup for review, not live figures

Order book

Every live job as one strip — segments are the stages, the fill is how far each has gone. Red flag = a hold is open on that job.

J465 · Voltsun Labs
520 MT · day 53
DRG
100
PROC
100
PRODN
62
DISP
38
MVR
35
ERECT
12
BILL
31
✗ 1 hold
detailed below ▾
J441 · RR Kabel
910 MT · day 128
DRG
100
PROC
100
PRODN
96
DISP
88
MVR
84
ERECT
71
BILL
66
✓ clear
J470 · Meridian Foods
260 MT · day 21
DRG
58
PROC
30
PRODN
DISP
MVR
ERECT
BILL
9
✗ 2 holds
colour conf. · GAD